These were two new build houses in Camberley, Surrey. We were contracted by Marble Construction Ltd to supply and install the herringbone engineered hardwood flooring.
As with any concrete structure, we applied anti moisture liquid DPM before the installation. This is necessary as it prevents the moisture from the concrete floor to rise up into the wood flooring.
After installation we applied Bona maintenance oil to add an extra layer of protection to the flooring.
At the very end, we covered the whole flooring with hardboard to protect it and to allow the other traders to continue working until completion.